top of page
Jeff Pond Yard View_edited.jpg

ABOUT US

The History and Evolution of Fred Wahl Marine Construction

Photo © Jeff Pond

1974 THE BEGINING

Fred Wahl Marine Construction began in 1974 in Depoe Bay, Oregon. With hands-on experience in marine repairs, welding, steel fabrication, and boatbuilding, Fred established his own marine construction business. His early career included building crab pots, repairing fishing vessels in Alaska, and working at Yaquina Boatworks, where he developed his skills in vessel construction and design. This experience laid the foundation for a growing commercial shipbuilding and repair operation.​

1970's Depoe Bay_edited.jpg

1980 OPENING SHOP

In 1980, Fred Wahl established his own approximately 5,360-square-foot shop in Depoe Bay, Oregon. The workshop provided dedicated space for welding, steel fabrication, and commercial vessel construction. This marked an important step in the company's early development, laying the foundation for expanded shipbuilding operations and future growth.

Old Building.jpg

1988 RECONGITION

In 1988, Fred Wahl Marine Construction began building the Cindria Gene at its Depoe Bay workshop. Vessels were transported by dump truck to the Port of Depoe Bay for launching at the harbor ramp. That same year, a Jensen-designed vessel built by Fred Wahl appeared on the cover of National Fisherman magazine, marking a significant milestone in the company's history.

CINDRIA GENE 5.jpg

1991 REEDSPORT

In 1991,  Fred relocated to Reedsport, Oregon and his crew restored the facility's 900-ton marine railway, capable of hauling vessels up to 170 feet. With direct waterfront access and dockside facilities, the move expanded the company's shipbuilding, repair, and maintenance capabilities while helping it navigate a downturn in new vessel orders.

Reedsport Old Yard.jpg

1998 KING CRABBER

In 1998, Fred Wahl Marine Construction completed two major steel fishing vessels at its Reedsport shipyard: the 98-foot Vixen, designed by Fred Wahl for the king crab fishery, and the 113-foot Sandra Five. These projects demonstrated the company's growing capabilities in designing and constructing larger commercial fishing vessels.

P6150012.JPG

2014 BOLON ISLAND

In 2014, Fred Wahl Marine Construction began expanding to a new 38-acre waterfront facility on Bolon Island along the Umpqua River in Reedsport, Oregon. The property featured a 50,000-square-foot fabrication building with overhead cranes and a 12,000-square-foot paint shop. The expansion laid the groundwork for increased shipbuilding capacity, major vessel repairs, indoor fabrication, and improved haul-out capabilities. That same year, the company completed the 58-foot April Lane and 58-foot Vigilant, continued construction of the 58-foot Oracle, and undertook an extensive reconstruction of the Miss Berdie. This milestone marked another significant chapter in the company's growth and development.

Bolon Island.jpg

2016 660 TON LIFT

In 2016, Fred Wahl Marine Construction expanded its Bolon Island facility with a new haul-out system designed for a 660-ton marine boat lift, capable of lifting up to 1.32 million pounds and accommodating vessels up to 42 feet wide. This major expansion allowed the shipyard to service larger commercial vessels, increase dry-land storage, and undertake extensive repairs, maintenance, and reconstruction projects.

Old Lift.jpg

2019 COAST GUARD

In 2019, Fred Wahl Marine Construction was selected as the West Coast shipyard for Birdon America's U.S. Coast Guard 47-foot Motor Lifeboat Service Life Extension Program (SLEP). The project involved extensive refurbishment and modernization of the Coast Guard's rescue vessels, including upgrades to propulsion, electrical, steering, and navigation systems. Designed to extend the lifeboats' operational service lives by 20 years, the program helps ensure these critical vessels remain ready for search-and-rescue operations.

Coast Guard.jpg

2021 850 TON LIFT

On November 12, 2021, Fred Wahl Marine Construction completed its first haul-out with the new Ascom boat lift at its Bolon Island shipyard, lifting the Provider, a 154-foot-long, 36-foot-wide tender operated by Silver Bay Seafoods. Replacing the previous 685-ton lift, the upgraded equipment expanded the shipyard's ability to service larger commercial vessels. Originally reported at 820 tons, the lift is now rated at 850 tons, accommodating vessels up to 42 feet wide. That same year, Fred Wahl Marine Construction also began work on the Nordic Fox, an entirely new 58-foot by 30-foot vessel design developed from the ground up. Construction began in 2021, with the completed vessel delivered in 2022,

Provider Lift 2021.jpg

2024 50 YEARS

In 2024, Fred Wahl Marine Construction celebrated its 50th anniversary with a five-day open house in August, honoring decades of craftsmanship, innovation, and growth. That same year, the company completed an extensive reconstruction of the Bay Islander, which returned to the water in January with major structural improvements, upgraded accommodations, and a new bulbous bow. These milestones reflected the company's continued dedication to quality shipbuilding and marine repair.

850 Lift Barn.jpg

2000's SUPER 8'S

In the early 2000s, Fred Wahl Marine Construction continued advancing its steel shipbuilding capabilities at the Reedsport shipyard. During this period, Fred developed the innovative 58-foot “Super 8” design, combining exceptional carrying capacity with efficiency and versatility. The first of these vessels, the Arctic Fox, was built for Fred's own company, Wahl Fisheries, and completed in 2006, establishing the foundation for one of the company's most recognizable vessel designs.

Fred Wahl Old Yard.jpg
bottom of page